Make your own free website on Tripod.com
« June 2012 »
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
You are not logged in. Log in
Blog Tools
Edit your Blog
Build a Blog
RSS Feed
View Profile
Entries by Topic
All topics  «
MY BLOG
Wednesday, 1 August 2007
BUILT ENVIRONMENT
Mood:  happy

BUILT ENVIRONMENT

built environment refers to the manmade surroundings that provide the setting for human activity, ranging from the large-scale civic surroundings to the personal places.

PRODUCTION.

there are six elements of production:

  • product
  • act
  • intention
  • actor
  • rules
  • site

SUSTAINABLE DEVELOPMENT

  1. integrated environmental stewardship,economic development and well being of people from generation to make development.
  2. this challenges facing government.NGO,communities and individuals.
  3. sustainable development means that beside we fullfill the human needs we must protect our natural environment.so that, these needs can be met not only in the present, but in the indifinite future.
  4. the important 3R are:
    • Reduce

    • recycle

    • renewable

  5. there are four parts to sustain development and must be considered before we make development:
    • Environmental sustainability

    • economic sustainability

    • social sustainability

    • political sustainability

  6. challenges ahead in the built environment:
    • Greater demand for land

      more people=more cities=more impact 

 PROPERTIES OF BUILT ENVIRONMENT

  • scale
  • layers

Scale

  • small
  • large

        scale                   actor

  1. object             industrial design
  2. interior           interior architect
  3. building           architect
  4. premise           landscape architect
  5. urban              urban designer
  6. regional           planner
  7. global              government

SPATIAL CONSTUCTION

  • node-place where path change direction
  • path

REPORT ON PROJECT CELAH

 

LADYSHIP

 

 

 

INDA HANIM BINTI SAMSI        95438        012- 6660953     

 ARCHITECTURE

 

KHAIREENA BINTI KAMIS         95442        017-5949059   

PLANING      

MAISARAH BINTI ABDUL           95468        012-4182072

RAZAK   

QUANTITY SURVEYING

       

SITI HIDAYATON BINTI               95584        019-9745720

RAZAK 

PROJECT MANAGEMENT 

 

 

WAN NOR WAHIDA                      95612        017-3536190         

SYUMAIYAH WAN                                                                    

KAMARUDDIN 

INTERIOR DESIGNING                                                                                   

 

WAN SITI ZUWAIRAH                  98972        013-9911556          

BINTI WAN AWANG                                                            

 BUILDING TECHNOLOGY

 

 

 

OBJECTIVES:

1.          To improve the environment of HBP

2.          To apply the 3r: by constructing path 

3.          To provide people of HBP with path

 

 

ACTIONS:

1.          We received the project on 1st August 2007. The Project “celah” asked us to make a 1m x 1m x height of plate. Each member of our group needs to have one plate each and for sustainability we have to combine all the plate to make 6m plate.

2.          After discussing with the group member, we start our project by searching for the material needed to make the plate. We agreed to use wood as the main material.

3.          Then, we started making name card and logo of our group and send it via email and to the pigeon hole.

4.          The next day, we started searching for the woods near the site in USM; near Cahaya Gemilang and the School of Pharmacy .

5.          It took us a week to finish making the plate.

6.          After finished making the plate, we choose a site near HBP.

7.          Our site is situated near the cone dome.

 

 

LOCATION:

 

Our plate is situated near the cone dome, in HBP area.

    


Posted by khaireena-88 at 11:44 PM EDT
Updated: Thursday, 25 October 2007 6:15 AM EDT
Post Comment | Permalink

Newer | Latest | Older